Backboards: 
Posts: 157
In response to "there are localized issues, or they might be doing road work on the beltway. generally though it's not too bad outside of the holidays. -- nm" by loosilu

That's going to be fun in the next 2 years...we're starting the Metro station construction there.

and down on Rt 7...

thankfully, there's 2 Circuit City's right at each station location that getting the land wasn't tough.


Post a message   top
Replies are disabled on threads older than 7 days.