In response to "Unless you rates are much larger than here, the work should not run you that much." by Spawn

the line from the stack to the street is 100'

at least 60ft (including around 20' under the basement floor which would need to have the floor cut out to replace) needs to be replaced. the depth at that farthest point is nearly 11' deep. if they have to replace all the way out, that means ripping out a sidewalk, going under the street, and possibly ripping up the driveway across the street to get to the connection.

that is the high end estimate.