Backboards: 
Posts: 159

This might fall apart over a receipt.

Not even - "not enough detail" on a receipt for a thing that's on as-built blueprints from the contractor and was inspected by the city for which we have given them the inspection letter.

I kind of want it to at this point. They think we're lying to them (this did not even occur to me as to why until my wife pointed it out). I'm *pissed*.


Responses:
Post a message   top
Replies are disabled on threads older than 7 days.