Backboards: 
Posts: 159
In response to "Updates on Miami ped bridge collapse" by Strongbad

I keep reading it was some new construction technology that was moved into place as a unit, which makes construction much faster. Maybe they didn't

know what they were doing? We use design/build a lot now and there are always more problems with it than when we designed the entire project and then started building it.

Responses:
Post a message   top
Replies are disabled on threads older than 7 days.