Backboards: 
Posts: 154
In response to "The planned fossil fuel generator to be built in Astoria has been rejected. :-) -- (link)" by Krusty

What is it going to be replaced with? -- nm

(No message)


Responses:
Post a message   top
Replies are disabled on threads older than 7 days.