Backboards: 
Posts: 155
In response to "Brightline addressed that by going electric as well as the plan is to put the rails within the already approved footprint of the I-15" by JD

the first sin was probably just not mapping it to the I-5 through the central valley but everybody gotta wet their beaks -- (edited)

"But the design for the nation’s most ambitious infrastructure project was never based on the easiest or most direct route. Instead, the train’s path out of Los Angeles was diverted across a second mountain range to the rapidly growing suburbs of the Mojave Desert — a route whose most salient advantage appeared to be that it ran through the district of a powerful Los Angeles county supervisor.

The dogleg through the desert was only one of several times over the years when the project fell victim to political forces that have added billions of dollars in costs and called into question whether the project can ever be finished."


Responses:
Post a message   top
Replies are disabled on threads older than 7 days.