Backboards: 
Posts: 155

Last week I had a notice from the city to expect extended repair work on our street over the next 3 months. Sidewalks, curbs, drains, and resurfacing.

This right after they've restriped all the streets to include bike lanes.

Right now there's a massive jackhammer ripping up the sidewalk outside my bedroom window.


Responses:
Post a message   top
Replies are disabled on threads older than 7 days.