Log In
Create Account
SlickerTalk
Search Archives
The Leaderboard
The FAQ
Login
Create Account
Search
Dr. S. Talk
TT/ST Wiki
How Well Do You Know ...
RSS Feed
Hosting by DigitalOcean
Support ST on Ko-Fi
Links Only
50 Results
100 Results
250 Results
500 Results
1000 Results
5000 Results
2 Weeks
2 Months
6 Months
1 Year
2 Years
5 Years
All Time
Live
Down to Post
Backboards:
Live
________________
1: Dec 1, 17:33
2: Dec 1, 11:23
3: Nov 30, 15:54
4: Nov 30, 09:41
5: Nov 29, 16:44
6: Nov 29, 08:01
7: Nov 28, 16:19
8: Nov 28, 09:42
9: Nov 27, 18:07
10: Nov 27, 12:04
11: Nov 27, 08:26
12: Nov 26, 18:06
13: Nov 26, 12:05
14: Nov 26, 08:29
15: Nov 25, 18:33
16: Nov 25, 11:12
17: Nov 25, 07:08
18: Nov 24, 13:17
19: Nov 23, 18:13
20: Nov 23, 06:17
Posts: 158
In response to
"
why? nobody ever see's the back of the sign and the supports or anchor posts drilled down in the back. -- nm*
"
by
Peglegpete
I'm just thinking about the logistics of making the 0s, transporting them, installing them as it would need to be sturdier than sheets of cardboard -- nm
Posted by
zeitgeist
Aug 11 '24, 16:51
(No message)
Responses:
They're made of corrugated steel on a metal frame. It'd probably take a few weeks max to design and build the necessary frame to make this edit.
-
Will Hunting
Aug 11, 16:55
2
yup. the letters on the front are bolted to the base at the end. each letter is several pieces so they do not have to deal with moving huge parts -- nm*
-
Peglegpete
Aug 11, 17:09
1
I was just thinking of some tictok or frat putting it up for a prank. Of course the town can bring in an excavator to lift sheet metal -- nm
-
zeitgeist
Aug 11, 20:28
Post a message
top
Replies are disabled on threads older than 7 days.