Backboards: 
Posts: 159
In response to "This made me check to see if 11foot8 was still around. Yup. -- nm" by mara

I missed that the bridge is now 11' 8" + 8"

And trucks still hit it 8-)

This partial time line cracked me up.

Oct 29 – Bridge raising
Oct 30-Nov 4 – Bridge painted
Nov 5 – at 10:00 AM Gregson St was re-opened for traffic under the bridge.
Nov 26 – the first truck hit the crash beam
https://www.youtube.com/watch?v=-VokezIMLKE


Post a message   top
Replies are disabled on threads older than 7 days.