In response to
"that was theoretically built into their high powered probability model. Either way, I dno't have to worry about it. I just have to use "
by
loosilu
|
This is probably too simple, but I'm going to throw it out there anyway
Posted by
Strongbad (aka Rambler14)
Dec 9 '10, 07:43
|
If you have 1 tab for Quake 1 analysis that works perfectly,
Create another tab for Quake 2 and run your same analysis again,
then Tab 3 could be your Sum?
|
Responses:
|