Backboards: 
Posts: 152

ok, the bedroom is "done", except for all the ex's stuff that she needs to get/trash

the guest room is 33% done, need to move the "bed" into the room and clean up the junk.

the kitchen is 66% done, need to remove construction stuff and rearrange.


Responses:
Post a message   top
Replies are disabled on threads older than 7 days.